Global Industrial Heaters
Corporate Profile

Engineering Heritage & Facilities

Discover our 15+ years of thermal engineering, custom heating element fabrication, state-of-the-art Chennai manufacturing works, and stringent zero-defect quality protocols.

Our Mission & Values

Pioneering Thermal Power & Heat Transfer

Global Industrial Heaters was established with a singular vision: to engineer and manufacture industrial electric heating elements that offer unmatched thermal efficiency, extreme corrosion resistance, and prolonged operational life in the most demanding industrial environments.

Guided by Operations Partner Mr. Saravanan, our engineering teams bring over 15 years of industry experience across plastics processing, HVAC commercial building conditioning, steam boilers, chemical electroplating vats, and food baking equipment.

Quality
Innovation
Reliability
Efficiency
Chennai Factory Works Engineering Team

Manufacturing Facilities

Chennai Fabrication Works & Equipment

Our modern manufacturing facility in Madambakkam, Chennai is equipped for comprehensive in-house element winding, swaging, metal forming, and precision brazing.

Element Winding & Swaging

Automatic spiral winding of high-grade 80/20 Nickel-Chromium resistance wire with high-density electro-fused MgO compaction.

Silver Brazing & TIG Welding

Argon/TIG welded stainless steel flanges and silver-brazed brass bushings ensure hermetic, pressure-tight seals.

Cast-In Foundry & CNC Grinding

Specialized gravity casting of aluminum LM6 and bronze alloys with precision CNC ground flat and cylindrical contact surfaces.

Quality Control

Zero-Defect Testing Bays

Every heating element manufactured at Global Industrial Heaters undergoes a rigorous 4-stage electrical and structural inspection before dispatch.

TEST #1

2500V Flash Test

100% dielectric strength testing for 60 seconds with zero electrical breakdown.

TEST #2

100 MΩ Megger Isolation

Tested at 500V DC to ensure cold insulation resistance exceeds 100 Megaohms.

TEST #3

Hydrostatic Pressure Testing

Immersion boiler bundles tested at 1.5x design operating pressure for zero leakage.

TEST #4

Resistance & Tolerance Check

Digital micro-ohm meter testing ensuring exact +/- 5% wattage tolerance compliance.